Optimize your industrial processes

 

Household, industrial and agricultural systems

Spain

SUNIA Spain has a 10 years’ experience in the Spanish market working with both private enterprises and public institutions. It’s one of the leading suppliers of renewable energy in the country.

In the public sector it actively participates in tenders for outdoor lighting providing engineering services, development, installation and project financing within the contract validity.

Likewise, SUNIA actively takes part in the promotion of photovoltaic power plants for sale to the Electricity market.

If you are an energy consumer and wish to reduce your monthly bills, generate your own sustainable energy and contribute to the preservation of the environment, go solar with SUNIA.

OUR EXPERIENCE IN SPAIN IS PROVEN

25
ROOFTOP MW
33
SOLAR PARKS MW

PHOTOVOLTAIC SYSTEMS

HOUSEHOLD, INDUSTRIAL AND AGRICULTURAL
Whether it is a household or an industry, photovoltaic consumption can be employed. Areas where it can be applied:

• Household systems: increase the autonomy of a minor consumer from big electricity companies, and save on bills generating clean, self sufficient and less pricy electricity than the one from the grids.

• Industrial systems: generation of electricity at a lower cost compared to the traditional grid one, during daytime when electricity is more expensive, this way reducing operational costs and enhancing your competitiveness.

• Agricultural sector: we power areas with no access to power grids or where installation of grids means big expenses. This way farmers have independent electricity.

• Irrigation and water pumping in agriculture or industries: the water needs of crops are directly related to the amount of solar radiation and therefore to the possibility of generating photovoltaic energy.

We adapt and build new groundwater pumping or surface ones to use solar energy, replacing grid electricity or the use of diesel engines by solar panels improving dramatically the benefits of the farmer.

We work closely with the client to find financing. Moreover, we fund facilities and charge from the savings we generate, with the eventual possibility of passing the ownership of the facilities to the customer.

We take a comprehensive look at our customers’ needs offering solutions based on:

1. Evaluation of needs, consumption and optimization.
2. Tailer-made solutions.
3. Optimization of energy supply contracts.
4. Study of technical and economic feasibility (wherever possible) to go off-grid.
5. Installation of the system.
6. Operation and maintenance of the systems.

This entire process is aimed to provide the user with a system that meets their specific needs and generates optimal output.

We have the entire construction channel integrated, from engineering to customer service, offering full, efficient and competitive solutions.

Outdoor Lighting

We offer the best solution for public and road lighting. We take a thorough analysis of the initial situation of lighting facilities to develop and install LED lights meeting the needs of each case, which results in a greater economic and environmental efficiency.

Energy Services

SUNIA Spain is currently developing electric power purchase contracts (PPA) in which SUNIA is the owner of the power systems and the client reduces their electricity bills at the electric company they have a contract with. Having internalized their entire value chain, SUNIA can offer competitive prices for any budget.

Solar Power Plants

Promotion of Solar Systems on the ground, for sale to the Electricity market.

Marketing

In the near future SUNIA Spain will operate in the electricity market through energy marketing and presentation of their own brand.

Projects accomplished in Spain

01_Foto Fogars II  5

1,8 MW rooftop, Fogars

2 November, 2016

01_2

1,62 MW rooftop, Puig Pelat

2 November, 2016

01_Seseña_20130314_00695

1,8 MW rooftop, Seseña

2 November, 2016

01_180420081052

3 MW on the ground, Zamora

2 November, 2016

Mercatenerife02

1,4 MW – Mercatenerife

2 November, 2016

Azuaga01

1,89 MW – Azuaga

2 November, 2016

Dos_hermanas02

630 KW – Dos Hermanas

2 November, 2016

OLYMPUS DIGITAL CAMERA

1,2 MW – Parque Solar La Gineta

2 November, 2016

alicante

500.000 WN – Alicante

2 November, 2016

alcantarilla

366 kWn – Alcantarilla

2 November, 2016

620327_hiersa

366 kW – Cartagena

2 November, 2016

01_IMG_0377

3MW on the ground, Caudete

1 November, 2016

icon-pointerCtra. de Valencia 69
46870 Ontinyent, Valencia.
Spain

icon-phone(+34) 960 709 523

EXPERTS IN SOLAR ENERGY
and energy services to companies and institutions

Learn more
INTEGRATION OF THE ENTIRE PROCESS CHAIN
makes us stand out in the market

Find out how